Official recipe · Tool workflows
Build a valuation model from live yield curves
Source-backed example. Practical decision guidance is proposed and untested; this is not a full implementation guide.
The problem
A valuation model can become disconnected from current market conditions when its discounting inputs do not reflect available yield-curve data.
Attributed source action
Use entitled market data to construct a discounted-cash-flow model with current yield curves.
Proposed review output
Proposed review artifact: Reviewable model draft with curve mapping, assumptions, sensitivities and unresolved methodology questions.
Where this framing comes from
- Core problem: Editorial purpose framing
- Agent job: Attributed source documentation or report
- Expected output: Original proposed guidance; not a source-reported result
- Relevant job roles: Editorial purpose framing
- Benefit type: Editorial purpose framing
Editorial framing and outcome limits
Describes the task’s purpose and intended output; measured benefit, safe unsupervised operation and successful delivery are not established by this framing.
Editorial synthesis based on the linked source. This framing does not add evidence of successful delivery or results.
Case-specific decision guidance · untested
Case-specific decision guidance and first checks are original proposals. The linked source supports the attributed task; this added guidance has not been executed.
Read the attributed source evidence and original caveats below ↓
Why use this
A discounted-cash-flow model can use a current-looking rate while applying the wrong currency, maturity convention or observation date. Changes in the yield curve also need to stay separate from changes in operating assumptions so reviewers can understand what moved the result.
This job could prepare a transparent valuation model with a dated input trail and sensitivity review. A finance professional could then examine the chosen discounting approach rather than accepting market-data freshness as proof that the valuation is appropriate.
Why an agent / simpler alternative
- Useful judgment
Reconcile market-data fields with model assumptions and explain source or tenor mismatches.
- Simpler alternative
Refresh an approved model’s rate inputs manually when the mapping is stable and limited.
- Unsuitable when
The task requires investment advice, trading or an unsupported valuation-method decision.
Proposed inputs
- Name
Cash-flow and model specification
- Owner
Finance owner
- Minimum scope
Approved projections, currency, valuation date and discounting method
- Quality check
Identify nominal versus real values and timing conventions.
- Name
Entitled yield data
- Owner
Data owner
- Minimum scope
Authorized curve observations, tenors, units and timestamps
- Quality check
Confirm entitlement and distinguish spot, par or forward rates.
Access and setup — proposed or unknown
- Proposed minimum
Use approved data exports and a separate model copy with an input provenance sheet.
- Compatibility unknowns
Unknown: LSEG entitlement, field definitions, curve coverage and spreadsheet compatibility.
- External actions requiring approval
Purchasing data, sharing licensed observations or changing financial accounts.
Expected deliverable and review checks
- Proposed artifact
Reviewable model draft with curve mapping, assumptions, sensitivities and unresolved methodology questions.
- Critical checks
Rate units and compounding align with cash-flow timing.
Stale or missing tenors are labelled rather than silently interpolated without an approved rule.
- Missing output evidence
No new run or output inspection in this editorial layer; see linked source-specific limits.
Failure signals and proposed responses
- Signal
A percentage rate is entered as a whole-number multiplier.
- Why it matters
The valuation can be materially distorted despite a valid source quote.
- Proposed response
Check units and use a simple independent sanity calculation before interpretation.
- Signal
The curve currency differs from the projected cash flows.
- Why it matters
The discounting basis may be economically inconsistent.
- Proposed response
Hold the calculation and ask the reviewer to approve an appropriate currency-consistent approach.
Effort and cost — unknown
- Setup work
Map curve fields and document discounting conventions.
- Ongoing review
Reconcile refreshed observations and review sensitivity to assumptions.
- Unknowns
Unknown: data costs, model-review effort and valuation uncertainty.
First check — proposed, unexecuted
- Status
proposed_unexecuted
- Synthetic fixture
Synthetic inputs include a rate-unit mismatch and cash flows denominated differently from the supplied curve.
- Acceptance checks
Both issues are identified before a value is interpreted.
No replacement rate or methodology is invented.
- Stop conditions
Entitlement, currency basis or a material financial assumption is unresolved.
Limits
Market-informed inputs do not establish fair value; the model remains conditional on assumptions and professional judgment.
Editorial candidate. This is source-backed reporting or a documented workflow. BotCurrent has not independently tested this task. A proposed Canadian adaptation is not evidence of a Canadian deployment or compliance certification.
Original source
https://claude.com/resources/articles/cowork-plugins-finance ↗Attributed to: Anthropic
Official recipe- Original action type
- tool_action
- Source outcome limits
- This official recipe describes a procedure; it does not prove successful execution or independently reproduced results.
- Evidence attribution caveat
- This official recipe describes a procedure; it does not prove successful execution or independently reproduced results.
- Source approval description
- Not specified.
- Named tools
- Claude Cowork; LSEG plugin
- Model or version
- Unknown
- Publication date
- 2026-02-24
- Source last checked
- 2026-10-14
- Demonstrated in Canada
- Unknown
- Canadian availability
- Unknown
- Proposed Canadian adaptation
- Use CAD consistently, identify Canadian reporting standards and have a qualified Canadian professional review assumptions; this is an adaptation proposal.
- Recommended approval boundaries
- Review outputs and source evidence; approve external messages, shared updates, access changes and consequential decisions before execution.