BotCurrent↗
← Back to examples

Official recipe

Prepare weekly time-entry drafts for the worker to verify

Weekly timesheets are easy to copy forward, even when assignments change or the hours no longer reflect actual work.

Read original recipe
Suggested result

A draft weekly time sheet with source labels, daily totals, duplicate warnings and questions about actual work.

What you need: Source-named agent: Dynamics 365 Project Operations; Time Entry Agent. Suggested inputs: Weekly source copies; Actual-work corrections; Comment allowlist. Start offline with fictional records and no calendar connection. Keep suggested time separate from confirmed time. Workflow costs and current compatibility remain unverified.

Proposed: verify actual work and client-safe wording before submission. Authorize calendar access and recurring creation separately; exclude payroll, billing and reimbursement.

Official recipe. BotCurrent has not independently tested this workflow.

Setup and access

Proposed inputs

  1. Name

    Weekly source copies

    Owner

    Worker

    Minimum scope

    One invented assignment grid, bookings and prior week

    Quality check

    Identify the week and duplicate project codes.

  2. Name

    Actual-work corrections

    Owner

    Worker

    Minimum scope

    Explicit changes to planned work

    Quality check

    Do not infer completed hours from a calendar.

  3. Name

    Comment allowlist

    Owner

    Project owner

    Minimum scope

    Topics permitted in client-facing descriptions

    Quality check

    Exclude private meeting content.

Access and setup — proposed or unknown

Proposed minimum
  1. Start offline with fictional records and no calendar connection.

  2. Keep suggested time separate from confirmed time.

Compatibility unknowns
  1. Unknown: present tenant version, enabled flows, optional calendar sharing and licenses; setup documentation contains a flow-count inconsistency.

External actions requiring approval
  1. Real time-record writes, submission, calendar access and recurring alerts.

Detailed steps and output format

At a glance

Suggested result
A draft weekly time sheet with source labels, daily totals, duplicate warnings and questions about actual work.Suggested; untested.
Tool
Dynamics 365 Project Operations; Time Entry AgentSource-named; check current access.
Suggested inputs
Weekly source copies; Actual-work corrections; Comment allowlistProposed; access notes below.
Human review
Proposed: verify actual work and client-safe wording before submission. Authorize calendar access and recurring creation separately; exclude payroll, billing and reimbursement.Suggested boundaries; source approvals below.
Setup notes
Start offline with fictional records and no calendar connection. Keep suggested time separate from confirmed time.Guide notes; proposed setup untested.
Cost
Workflow cost not established. Check current tool pricing, setup and human review costs before trying it.No measured cost or time added.
Content depth
Source-linked example · suggestions untestedDepth does not establish successful execution.
Check source evidence and limits ↓

Function and scope

Operations, People · Ongoing responsibility

Editorial classification; no execution or compatibility test is implied.

No tool mapping reviewed for this task.

Source-backed example. Practical decision guidance is proposed and untested; this is not a full implementation guide.

The problem

Weekly timesheets are easy to copy forward, even when assignments change or the hours no longer reflect actual work.

Suggested task · untested

Proposed: Prepare a small draft week with provenance and an explicit worker-verification column.

What you could produce

A draft weekly time sheet with source labels, daily totals, duplicate warnings and questions about actual work.

Where these suggestions come from
  • Core problem: Our suggestion; no result reported by the source
  • Agent job: Our suggestion; no result reported by the source
  • Expected output: Our suggestion; no result reported by the source
  • Relevant job roles: Our suggestion; no result reported by the source
  • Benefit type: Our suggestion; no result reported by the source
Suggestions and their limits

Describes the proposed purpose and review output; measured benefit and successful delivery are not established.

Editorial synthesis based on the linked source. This framing does not add evidence of successful delivery or results.

Before you try it · suggestions untested

Original decision guidance and first check are proposals. The source supports the attributed task; this guidance has not been executed.

Read the attributed source evidence and original caveats below ↓

Why use this

  1. A time sheet mixes planning information with the worker’s knowledge of what happened. Those are different kinds of evidence.

  2. A draft can reduce blank-page entry while making assumptions visible for correction.

Why an agent / simpler alternative

Useful judgment

Explain conflicting source suggestions and propose concise work descriptions.

Simpler alternative

Import a fixed assignment grid when hours and project codes are already exact.

Unsuitable when

The worker cannot verify actual activity or the task requires payroll or billing decisions.

Expected deliverable and review checks

Proposed artifact

A draft weekly time sheet with source labels, daily totals, duplicate warnings and questions about actual work.

Critical checks
  1. Daily totals reconcile to individual rows.

  2. Every row has a source and confirmation status.

  3. Descriptions contain no unapproved personal or customer detail.

Missing output evidence

Unknown: no actual tenant output or completed run independently inspected.

First check — proposed, unexecuted

Status

proposed_unexecuted

Synthetic fixture

A fictional week containing a cancelled assignment, an overlapping booking, a copied prior-week task and a meeting title marked private.

Acceptance checks
  1. Flag the cancelled and overlapping work.

  2. Keep copied hours unconfirmed.

  3. Exclude private wording and reconcile totals.

Stop conditions
  1. Live calendar access, actual employee records or submission to payroll or billing.

Tasks: Writing & contentPlanning & operations

Useful for: Project manager

Editorial relevance from the title and source-supported actions; not evidence of the operator’s occupation.
Dynamics 365 Project Operations; Time Entry AgentIndependent testing: No
Failure handling, costs and limits

Failure signals and proposed responses

  1. Signal

    Repeated previous-week work

    Why it matters

    A fallback may repeat finished work.

    Proposed response

    Ask the worker to confirm each carried-over item.

  2. Signal

    Double-counted booking

    Why it matters

    Two inputs may describe one activity.

    Proposed response

    Keep both references but one unresolved time allocation.

  3. Signal

    Sensitive draft comment

    Why it matters

    Meeting wording can expose unrelated information.

    Proposed response

    Remove the text and request a client-safe description.

Effort and cost — unknown

Setup work
  1. Map project codes, week boundaries and comment rules.

Ongoing review
  1. Worker confirms hours and exceptions each period.

Unknowns
  1. Unknown: usage fees, review effort and current product behavior beyond dated documentation.

Limits

  1. A planned draft is never proof that hours were worked.

Full source evidence

Official recipe · Tool workflows

Original task title: Prepare weekly time-entry drafts for the worker to verify

Editorial candidate. This is source-backed reporting or a documented workflow. BotCurrent has not independently tested this task. A proposed Canadian adaptation is not evidence of a Canadian deployment or compliance certification.

Original source

https://learn.microsoft.com/en-us/dynamics365/project-operations/time/reviewing-entries-created-by-time-agent ↗

Attributed to: Microsoft Learn

Supporting source context

Project documentation supporting the linked recipe’s scope, permissions and limits. These references do not establish an independent test or add counted jobs.

Official recipe
Original action type
tool_action
What the source reports
Creates weekly draft entries using selected assignments, booked capacity and prior-week fallback; generates optional external comments; sends Teams summaries and missing-hours alerts.
Source outcome limits
Production-ready preview documentation dated August 2025. Draft hours are generated at week start, not proof of work completed. No time submission or successful run inspected.
Evidence attribution caveat
This official recipe describes a procedure; it does not prove successful execution or independently reproduced results.
Source approval description
Workers edit drafts before submitting for approval. Teams day-level edits cover only duration and external comments.
Named tools
Dynamics 365 Project Operations; Time Entry Agent; Power Automate; optional Teams and Outlook.
Model or version
Unknown
Publication date
Unknown
Source last checked
2026-10-14
Demonstrated in Canada
Unknown
Canadian availability
Unknown
Proposed Canadian adaptation
Proposed: have the local process owner verify language, access, work rules and retention. Canadian execution and tenant availability are unverified.
Recommended approval boundaries
Proposed: verify actual work and client-safe wording before submission. Authorize calendar access and recurring creation separately; exclude payroll, billing and reimbursement.